Mast Way School
Updated: 11/06/2025
Read Superintendent Shaps' most recent project update.
The district worked with its architectural and construction management partners to scale down the original scope of work to ensure an overall project cost of less than $10 million.
Our guaranteed maximum price (GMP) for this project, which cannot be exceeded, is $9,827,000.
The district will propose this project to voters in March 2026.
- The updated scope of work for Mast Way School is available below. Moharimet School's scope of work is available here.
- An overview of the whole project is available on our Elementary Project page.
- The planning history of our elementary schools' expansion and renovation projects is available on our Planning History page.
Scope of Work: Mast Way School
Floor plans and renderings may be found below.
Cafeteria Expansion
| Problem | Solution |
| The existing space is at capacity, with no room for additional occupants. Surfaces are hard, creating acoustic challenges and an uncomfortably loud atmosphere. | Expansion to accommodate more occupants and better acoustics adding enough square footage for an additional 39 students and staff. |
OT/PT Room
| Problem | Solution |
|
Existing space is oversized and not at grade with the existing school. |
Right size the room and lower the floor to match the existing school. |
Library/North Commons
| Problem | Solution |
|
Spaces are separated by a wall, creating two small areas and preventing team teaching opportunities for the librarian and STEM teacher. |
Remove the wall and open the space for greater flexibility and project-based learning opportunities. |
Math and Science
| Problem | Solution |
|
The Math and Science specialist does not have a dedicated teaching room and is utilizing a conference room since the space had to be converted to a general education classroom. |
Create floor plan efficiencies and carve out a right-sized room to accommodate teaching demands next to the Library/Learning Commons in a space serving as storage and a Cool Down Room, which will be moved as part of this project. |
Cool Down Room
| Problem | Solution |
|
The existing room is located next to the library. When a student is dysregulated, the noise can travel, creating interruptions in student learning in nearby rooms, including the library. Additionally, it is best located closer to the front of the building where other student resources are located. |
By reducing the OT/PT room to an appropriate size, the square footage can be allocated to a new location for the Cool Down Room. |
Resources Room/ESOL
| Problem | Solution |
| The Resource Room is currently within a general education classroom and is undersized. | By relocating this room to the classroom next to the ESOL teacher's office, a space that is oversized, the additional square footage can be allocated to the Resource Room. |
Student Break and Testing Room
| Problem | Solution |
| The school does not have enough small rooms for students on special learning plans for private testing. | The corridor next to the cafeteria is redundant, and the space is appropriately sized for a small testing room to hold 3 to 6 people. |
Rendering of the proposed renovation of the Mast Way library and North Commons.